MHG49648 - Fort William, Lochaber Aluminium Smelter, Power House

Summary

No summary available.

Type and Period (1)

  • POWER STATION (20th Century - 1929 AD to 1929 AD)

Protected Status

Full Description

NMRS Report: (09/06/2006 17:02:03)
NN17NW 16.01 12766 75112

The power house was listed at Grade B on 04/09/2012. <2>
Notes Lochaber Hydro-Electric Works
(Institute Civil Engineers Historic Engineering Works no. HEW 1434)

The Lochaber Power Company was established by Act of Parliament in 1920 to produce aluminium using electric smelters. The company was authorised to develop a catchment area of 303 square miles in the vicinity of Ben Nevis which had, in places, a rainfall of 160 in. and was admirably
suited for the site of a hydro-electric scheme.
The runoff was collected in two reservoirs, Loch Laggan and Loch Treig, connected by a tunnel 234 miles long and 15 ft diameter. The supply of water was supplemented by the diversion of the upper waters of the Spey into Loch Laggan from a dam 900 ft long and 30 ft high, built 2 miles above Laggan Bridge.
The most remarkable feature of the scheme was the construction of a pressure tunnel 15 miles long beneath Ben Nevis, from Loch Treig to the entry with steel pipes situated 600 ft above the power station at Fort William.
In driving the tunnel, four vertical access shafts were sunk and seven horizontal adits driven to allow 22 separate working faces, all in solid rock. The tunnel has a roughly horseshoe cross-section with an equivalent diameter of 15 ft. Eleven streams on Ben Nevis were dammed and their flows taken into the tunnel through three construction shafts adapted for the purpose.
The tunnel drive began in 1926 and was completed in1930. The work required the construction of a temporary hydro-station to power construction equipment, an extensive network of 3 ft narrow gauge railway to transport men and materials, and a reinforced-concrete pier 200 ft long on Loch Linnhe which later became permanent. At the height of the work 3000 men were employed. The consulting engineer was William Halcrow and the main contractor, Balfour Beatty &amp; Co. Ltd.
R Paxton and J Shipway, 2007.
Reproduced from 'Civil Engineering heritage: Scotland - Highlands and Islands' with kind permission from Thomas Telford Publishers.

Sources/Archives (2)

Map

Location

Grid reference Centred NN 12766 75111 (20m by 20m) (2 map features)
Map sheet NN17NW
Civil Parish KILMALLIE
Geographical Area LOCHABER

Finds (0)

Related Monuments/Buildings (0)

Related Investigations/Events (0)

External Links (2)

Comments and Feedback

Do you have any more information about this record? Please feel free to comment with information and photographs, or ask any questions, using the "Disqus" tool below. Comments are moderated, and we aim to respond/publish as soon as possible.