EHG4524 - DBA - Hill of Lybster Turbines

Technique(s)

Organisation

The Energy Workshop

Date

March 2013

Description

This Environmental Report (ER) presents environmental information in support of an application for planning permission to construct and operate two wind turbines each with a maximum tip height of up to 79 metres (m) and an electrical output of around 800 kilowatts giving a total output of around 1.6 megawatts (MW) on the Hill of Lybster in the Caithness West Community Council area of Caithness. A desk-based assessment has been carried out by The Energy Workshop Limited following a visit to the site and the surrounding area. It has drawn on readily available documentary and cartographic evidence, to inform the baseline condition of the site. <1> A site visit is mentioned in the above report, but there is no further information on it.

Sources/Archives (1)

Map

Location

Location Land 200m North of 3 Lybster Road, Forss
Grid reference Centred ND 0260 6923 (20070m by 20070m) (2 map features)
Map sheet ND06NW
Operational Area CAITHNESS SUTHERLAND AND EASTER ROSS
Civil Parish REAY
Civil Parish THURSO
Geographical Area CAITHNESS

Related Monuments/Buildings (0)

External Links (0)

Record last edited

Jan 15 2018 9:40AM

Comments and Feedback

Do you have any more information about this record? Please feel free to comment with information and photographs, or ask any questions, using the "Disqus" tool below. Comments are moderated, and we aim to respond/publish as soon as possible.