EHG4535 - DBA and Walkover Survey - Tressady Wind Farm

Technique(s)

Organisation

Wind Prospect Developments Ltd

Date

July 2013

Description

An environmental assessment was carried out in relation to a planning application ( The construction and operation of a wind farm (Tressady) consisting of thirteen (13) wind turbines (2.5 MW turbine on 70m tower with blade tip height of 115m) and associated infrastructure including site entrance, access tracks, switchgear building and compound, permanent meteorological mast, temporary construction compound, water crossings and upgrading to the access route to the wind farm site.)

Sources/Archives (1)

Map

Location

Location Land 1600m West of Tressady Estate, Rogart
Grid reference Centred NC 7184 0830 (3663m by 3663m)
Map sheet NC70NW
Geographical Area SUTHERLAND
Operational Area CAITHNESS SUTHERLAND AND EASTER ROSS
Civil Parish ROGART

Related Monuments/Buildings (0)

External Links (0)

Record last edited

Jan 15 2018 9:41AM

Comments and Feedback

Do you have any more information about this record? Please feel free to comment with information and photographs, or ask any questions, using the "Disqus" tool below. Comments are moderated, and we aim to respond/publish as soon as possible.