EHG4535 - DBA and Walkover Survey - Tressady Wind Farm
Technique(s)
Organisation
Wind Prospect Developments Ltd
Date
July 2013
Description
An environmental assessment was carried out in relation to a planning application ( The construction and operation of a wind farm (Tressady) consisting of thirteen (13) wind turbines (2.5 MW turbine on 70m tower with blade tip height of 115m) and associated infrastructure including site entrance, access tracks, switchgear building and compound, permanent meteorological mast, temporary construction compound, water crossings and upgrading to the access route to the wind farm site.)
Sources/Archives (1)
Location
Location | Land 1600m West of Tressady Estate, Rogart |
---|---|
Grid reference | Centred NC 7184 0830 (3663m by 3663m) |
Map sheet | NC70NW |
Geographical Area | SUTHERLAND |
Operational Area | CAITHNESS SUTHERLAND AND EASTER ROSS |
Civil Parish | ROGART |
Related Monuments/Buildings (0)
External Links (0)