Description

An archaeological watching brief was carried out by AOC Archaeology Group at Farr, near Inverness, in advance of the installation of a transmission cable as part of the construction work for the Knocknagael to Tomatin 275kV overhead line. The overhead line runs through a rich prehistoric and post-medieval archaeological landscape. As a result, all ground breaking was subject to a watching brief. The watching brief was carried out intermittently between April and July. There were no finds or features of archaeological significance recorded. In addition to the watching brief, a walkover survey was undertaken at the area of Dip 3 where five previously unrecorded sites related to post-medieval settlement were identified as being at risk from development works; including two dykes and three structures. Due to changes in the programme, the works at Dip 3 were not required.

Sources/Archives (1)

Map

Location

Location Farr
Grid reference NH 6790 3304 (point)
Map sheet NH63SE
Operational Area INVERNESS NAIRN BADENOCH AND STRATHSPEY
Civil Parish DAVIOT AND DUNLICHITY
Geographical Area INVERNESS

Related Monuments/Buildings (0)

External Links (0)

Record last edited

Feb 16 2021 4:03PM

Comments and Feedback

Do you have any more information about this record? Please feel free to comment with information and photographs, or ask any questions, using the "Disqus" tool below. Comments are moderated, and we aim to respond/publish as soon as possible.