EHG5736 - Watching brief - Ground investigation works, Beauly Substation
Technique(s)
Organisation
AOC Archaeology Group
Date
Nov 2021
Description
An archaeological watching brief was undertaken by AOC Archaeology Group in 2021 during geotechnical investigations, at land adjacent to Beauly Substation, Highland, ahead of proposed cable undergrounding works. The watching brief monitored the excavation of 5 geotechnical test pits, 1 borehole service pit, and an Intrusive Foundation Inspection (IFI) pit at the base of an electrical tower. No archaeological features, deposits, or artefactual material were identified. Due to the remaining potential for archaeological resource(s) in the area, it is proposed any further ground-breaking works in these locations also be monitored. <1>
Sources/Archives (1)
Location
Location | Beauly Substation |
---|---|
Grid reference | Centred NH 5001 4485 (1127m by 442m) (2 map features) |
Map sheet | NH54SW |
Operational Area | INVERNESS NAIRN BADENOCH AND STRATHSPEY |
Civil Parish | KILMORACK |
Geographical Area | INVERNESS |
Related Monuments/Buildings (0)
External Links (0)
Record last edited