EHG5907 - Trial trenching - grid stability facility, Thurso sub station, Geiselittle
Technique(s)
Organisation
CFA Archaeology Ltd
Date
Sept 2022
Description
A trial trenching evaluation was conducted by CFA Archaeology in 2022 prior to the erection of a grid stability facility with ancillary works including landscaping, parking, grid connection, drainage, and boundary enclosures at Thurso South Sub Station, Geiselittle, Thurso. Fifty trenches were excavated with a total area of 4500m². A series of agricultural ditches were recorded that align with field boundaries on the First Edition OS Map. Three isolated features were identified across the site that are most likely representative of stone-holes. <1>
Sources/Archives (1)
- <1>XY SHG29172 Text/Report/Fieldwork Report: Francis, H.. 2022. Erection of grid stability facility at Thurso South Sub Station, Geiselittle, Thurso. CFA Archaeology. 04/10/2022. Digital. [Mapped features: #12814 ; #12815 Trenches, ]
Location
Location | Thurso sub station, Geiselittle |
---|---|
Grid reference | Centred ND 1238 6504 (295m by 340m) |
Map sheet | ND16NW |
Operational Area | CAITHNESS SUTHERLAND AND EASTER ROSS |
Civil Parish | THURSO |
Geographical Area | CAITHNESS |